For the last week or so we have been letting the cement cure. We noticed some spots that are still letting water in along the wall because of the heavy rain we have been having so Jason has repointed those spots.
On Saturday we had a load of 220 2x4's delivered in inticipation of the framing beginning as we have the kitchen guy coming on friday to take measurements!
Today we had our other window put in. That had been put off because of some electrics that needed to be moved. It looks great.