We (meaning Scott mostly) have been picking away at the little things that need to be done. Duncan has finished all the wiring, he finished up on Saturday, there were a few things that needed tweaking. That included hooking up the hot water heater so we have had hot water the last few days - yay! Now the plumber needs to come back and hook up the dishwasher, tub, toilet and sink. But first the tile guy is going to tile the floor in the bathroom. That should hapapen this week, he is also going to do the backsplash in the kitchen and the tile around the tub too. The stained concrete guy should be coming soon to do the front entrance and the retaining well in front of the house. She has been held up by herniated discs in his back. We were going to have him do the bathroom floor as well, but the waiting for him is getting in the way of getting the bathroom done...so we went ahead and got tile and lined up a guy to do it.
Mike and Scott built the surround for the tub on Monday and on Tues. Scott painted the bathroom. On thursday Matthew from Home Depot returned to put in the tambour storage units, trim out the pantry and a few other little things that were left. He also replaced one of the cupboard doors that was damaged.
The blinds that we ordered also arrived on Thursday after a detour in Mississipi ;o)
Tub surround


Bathroom paint

Kitchen pantry


Blinds
No comments:
Post a Comment